Wednesday, 22 March 2017

PROJECT PROFILES -Waste Water Pumping Stations - City of Ottawa

Scope of Work:

  • Replace 17 diesel fuel storage tanks and complete 36 fuel system upgrades
  • 30 exhaust stack system replacements to be completed
  • Multiple temporary standby power generator installations
  • Project timeline was from September 2012 to November 2014

Challenges:

  • Large scale job requiring full planning and project management services to stay on time and on budget
  • Ensuring all targets/ goals were met
  • Ministry of the Environment requirement to keep all these stations with generator back up at all times
  • 38 monthly variance inspections to be performed at 38 waste water facilities
  • Final comprehensive inspections also to be completed

Our Solution:

  • Final comprehensive inspections carried out at 39 waste water facilities
  • Fuel system is now efficient and compliant
  • Project completed on time and on budget with full power back up at all stations continually

For more information about how GAL Power can make your project a success, visit us at www.galpower.com or call us at 1-866-425-7368

24/7 Power Line 1-866-425-7697